Corrigan Construction managed the removal of the facility’s existing stormwater intake from the building main and installed a standalone drain.
ARCHITECT
Nowak & Fraus Engineers
INDUSTRY
Healthcare
CONSTRUCTION STATUS
Completed
DURATION
1 months
DELIVERY METHOD
Hard Bid