Corrigan Construction completed renovations to the existing facility to remove walls near the dining room to reconfigure the space. ARCHITECTGhafari, J. Whitman LOCATIONTraverse City, MI INDUSTRYHealthcare CONSTRUCTION STATUSCompleted DURATION1.5 months SIZE6,034...
Design Build Renovation of an existing strip mall into a new fully renovated, state of the art Chiropractic Office. INDUSTRYHealthcare ARCHITECTPucci and Vollmar DURATION6 months SIZE13,000 sq/ft TYPEDesign-Build
Corrigan Construction completed renovations to convert rooms into open concept common areas in the existing skilled nursing facility. ARCHITECTGhafari, J. Whitman INDUSTRYHealthcare CONSTRUCTION STATUSCompleted DURATION1 month SIZE1,020 square feet DELIVERY METHODHard...
Corrigan Construction managed the removal of the facility’s existing stormwater intake from the building main and installed a standalone drain. ARCHITECTNowak & Fraus Engineers INDUSTRYHealthcare CONSTRUCTION STATUSCompleted DURATION1 months DELIVERY METHODHard...
Corrigan Construction constructed a concrete ramp to create a handicap accessible entrance for the skilled nursing facility. ARCHITECTRichard Postema INDUSTRYHealthcare CONSTRUCTION STATUSCompleted DURATION1 month SIZEN/A DELIVERY METHODHard...